
Romania’s Highways Company CNADNR announced in a press release that the Technical Inspection Commission and representatives of the Traffic Police checked the highway section on Sunday, October 9. After analyzing the work’s quality, “the Commission found that the conditions for opening the traffic safely have been met.”
The highway section was inaugurated in November 2014, just before the Presidential elections, and was closed in September 2015 due to structural problems. The first cracks in the highway appeared only two weeks after it was inaugurated. At first, CNADNR tried to fix the cracks and had the traffic restricted, but the rift only got wider.
A report made by the Control Body within the Transport Ministry, showed in February this year that the road had cracks even before the inauguration.
Photo: OradeSibiu.ro
Read more HERE
Comments
comments